1 STP-DHI DISPENSER HOOK ISOLATION STP-DHI 120 Volt Hook STP-DHIB 240 Volt Hook Installation and Owner’s Manual Franklin Fueling Systems • 3760 Marsh Rd.
STP-MLD+ Installation and Owner’s Manual Manual # Revision Date Changes from previous revision 400439002 3 Sept. 2014 Changed MLD+AG description to 85%
©2006 401323001 Rev. 7 Franklin Fueling Systems • 3760 Marsh Rd. • Madison WI 53718 USA Tel: +1 608 838 8786 • 800 225 9787 • Fax: +1 608 838 6433 • www.franklinfueling.com
©2013 400439001 Rev. 7 Franklin Fueling Systems • 3760 Marsh Rd. • Madison WI 53718 USA Tel: +1 608 838 8786 • 800 225 9787 • Fax: +1 608 838 6433 • www.franklinfueling.com
High Capacity Submerged Turbine Pumps INSTALLATION GUIDEThe information in this publication is provided for reference only. While every effort has been
Marketers concerned about fueling times, efficiency, serviceability, reliability and overall quality find it an easy choice to specify FE Petro™ brand
Marketers concerned about fueling times, efficiency, serviceability, reliability and overall quality find it an easy choice to specify FE Petro™ brand
HIGHLIGHTS • Powder-coated and E-coated finishes protect exterior cast surfaces from accelerated corrosion. • Stainless steel fasteners, riser, variable
TECH UPDATE TB0820-01 r2 TS-LS500 REQUIRED STEPS AND BEST PRACTICES IMPORTANT: DO NOT apply dielectric grease, or any other dielectric compound, to the
Syphon System Testing The following procedure illustrates syphon system testing techniques on 4” pumps. When manifolded tanks are not maintaining equal