FLEX-ING™ brand utility break aways are designed to provide protection for dispensing equipment at high capacity fueling locations. These heavy-duty break aways are ideal for applications including marinas, truck and bus terminals, off road refueling, fuel oil delivery and other industrial applications.
The high capacity mechanical leak detector is capable of detecting leaks of 3 gph (11.4 lph) or greater at 10 psi (69 kpa). Its compact design allows installation in the same containment sump as the submersible pump, greatly reducing the amount of unprotected leak points between the submersible and the mechanical leak detector.
APT’s TS-2430, TS-3630 and TS-4230 tank sumps are ideally suited for low cost retro fits and shallow burial applications. The TS-2430 is ideal for line branching points and for containing piping splices. The 36" or 42" bases provide ample space for submersibles and fittings. The bolt-on gasket-lid combination fits economically under a 30" manway.
The APT® below grade intermediate piping sump is a multifunctional component in the underground flexible piping system. The IPS-2424 and IPS-3636 can be used as a containment sump for fittings when utilizing a tee between dispenser islands, for contained piping splices, or for line branching points. These sumps are ideal for a low point sensor chamber between USTs and dispenser islands where required.
Ball float vent valves are used in conjunction with extractor vent valves in the Stage I vapor riser or tank vent lines on underground storage tanks. The ball float vent valve will restrict vapor venting should a full tank condition occur and protects against product mixing and vapor locks due to vent pipe flooding. WARNING: 308 Series float vents should not be used with suction pump systems. For use on gravity drop systems only. Do not use with pump-off unloading. Do not use with coaxial Stage I vapor recovery drop tubes.
APT® ducted double wall rigid entry boots allow you to create watertight connections between APT® 4” XP pipe and double wall fiberglass containment sumps. These boots are easily installed to the sump wall using adhesive (included) without the additional messy fiberglass work required. Rigid entry boots require only a single 3 ¾" entry hole for installation, eliminating the time-consuming process of drilling multiple holes as well as the templates they require.
With the PetroTite Standard and Optimum fusion chambers the riser section electrofuses to the base, removing the need for multiple bolt holes and foam gaskets in this area, therefore dramatically reducing the number of potential leak paths. With its simplified assembly, this electrofusion system also reduces the installation time. Welding of the chamber can be performed using UPP electrofusion equipment in approximately six minutes. Once welded and cooled the base and riser of the OCH models become one homogeneous unit, with no mechanical joints and no leak points. The chamber can then be vacuum tested to ensure that it is 100% leak-tight. The Optimum chamber is available with either Deep or Shallow bases, and both will allow for a very easy installation of pipework before the riser is fused into place.
FLEX-ING™ brand ball valves provide in-line product flow shutoff, making testing and inspection of equipment easy. Incorporating ball valves into the installation of your pipework system up front can save you on time, labor and dispenser shutdown costs for years to come. The use of ball valves allows you to isolate and shut down the flow of product to specific system components so you can perform maintenance or inspection on only the desired components, while the rest of the system remains in operation.