Ensure proper vapor recovery every time by using the Air Interlock with Limit Switch. With the limit switch, bottom loading cannot begin until a vapor recovery hose is connected to the vapor check valve. The switch does its job by breaking a connection in the secondary over-fill prevention system, thus preventing the rack monitor from giving a green light to the transport. Once a vapor line is connected, loading can begin. The coupler first depresses the plunger button of the interlock, which then locks the trailer brake system and completes the connection to the rack monitor. The vapor hose must be disconnected before the brakes will release, allowing the truck to be driven away.
The STP-SCIII & STP-SCIIIC controllers provides valuable pump protection and performance features for 3 HP and 5 HP high capacity pumps.
Proactively monitor for and remove the main corrosion-causing elements including water and moisture from diesel tanks and containment sumps with the Corrosion Control™ System.
Used to install, service, and test Defender Series® overfill prevention valves.
The EBW® vapor shear valve is designed for use as an emergency breakaway on Stage II vapor recovery lines in fuel dispensers. The double poppet design allows spring-loaded poppets inside the valve to seal vapors within both the dispenser riser and vapor piping in the event of dispenser displacement, providing maximum environmental protection.
Ball float vent valves are used in conjunction with extractor vent valves in the Stage I vapor riser or tank vent lines on underground storage tanks. The ball float vent valve will restrict vapor venting should a full tank condition occur and protects against product mixing and vapor locks due to vent pipe flooding. WARNING: 308 Series float vents should not be used with suction pump systems. For use on gravity drop systems only. Do not use with pump-off unloading. Do not use with coaxial Stage I vapor recovery drop tubes.
The magnetic starter incorporates ambient compensated relays with quick trip heaters and three leg protection to assure proper 3 HP and 5 Hp pump motor protection.
FLEX-ING™ brand ball valves provide in-line product flow shutoff, making testing and inspection of equipment easy. Incorporating ball valves into the installation of your pipework system up front can save you on time, labor and dispenser shutdown costs for years to come. The use of ball valves allows you to isolate and shut down the flow of product to specific system components so you can perform maintenance or inspection on only the desired components, while the rest of the system remains in operation.
SAFE-LITE FRC access covers are ultra lightweight. Engineered and tested to meet or exceed H20 and HS20 load ratings. Covers weigh almost one-third less than steel, which dramatically reduces injury potential during cover removal. Available in 12", 30", 36", and 42" sizes. The slide action cover further reduces the chance of injury by eliminating the need to bend down to remove or replace the cover.
With the PetroTite Standard and Optimum fusion chambers the riser section electrofuses to the base, removing the need for multiple bolt holes and foam gaskets in this area, therefore dramatically reducing the number of potential leak paths. With its simplified assembly, this electrofusion system also reduces the installation time. Welding of the chamber can be performed using UPP electrofusion equipment in approximately six minutes. Once welded and cooled the base and riser of the OCH models become one homogeneous unit, with no mechanical joints and no leak points. The chamber can then be vacuum tested to ensure that it is 100% leak-tight. The Optimum chamber is available with either Deep or Shallow bases, and both will allow for a very easy installation of pipework before the riser is fused into place.